Spacer Spacer Spacer Spacer Spacer
MMirck ArchitectureIMirck ArchitectureRMirck ArchitectureCMirck ArchitectureKMirck ArchitectureAMirck ArchitectureRMirck ArchitectureCMirck ArchitectureHMirck ArchitectureIMirck ArchitectureTMirck ArchitectureEMirck ArchitectureCMirck ArchitectureTMirck ArchitectureUMirck ArchitectureRMirck ArchitectureE
NNEWSENEWSWNEWSSBBUILDINGSUBUILDINGSIBUILDINGSLBUILDINGSDBUILDINGSIBUILDINGSNBUILDINGSGBUILDINGSSDDESIGNSEDESIGNSSDESIGNSIDESIGNSGDESIGNSNDESIGNSSOOFFICEFOFFICEFOFFICEIOFFICECOFFICEENNEWS ARCHIVEENEWS ARCHIVEWNEWS ARCHIVESNEWS ARCHIVEANEWS ARCHIVERNEWS ARCHIVECNEWS ARCHIVEHNEWS ARCHIVEINEWS ARCHIVEVNEWS ARCHIVEE
RENOVATION MONUMENT LEIDEN - APRIL 2011
Spacer
Spacer
Renovation monument leiden - april 2011
HIGHEST POINT RENOVATION STUDENT RESIDENCE LEIDEN - APRIL 2011
 

Straight after all the necessary permissions, a very rapid preparation and construction led to the highest point in April. The picture shows the new steel floor and roof on top of the 14th century monument. On the background the early medieval prison Gravensteen.

In the next month the roof will be closed and cladded. After intensive çonsultation with the ARK (spatial quality control) the materials will be the same as the other buildings in this monumental quarter. In the end of the summer it will be difficult to see the 2011 addition.

Spacer
Spacer